Before You Begin > Prerequisites

Prerequisites

Before you begin your deployment:

  • Read this entire guide before your first EdgeConnect deployment.
  • Silver Peak recommends that all new EdgeConnect and Orchestrator deployments run VXOA version 8.1.4.0 or above.
  • Prior to making any network changes, it’s good idea to print and work with the customer to complete the deployment worksheet in Site Deployment Worksheet.
  • This guide assumes a bridge mode deployment where the MPLS and INTERNET are in separate layer 3 subnets.
  • Each EdgeConnect appliance requires one IP address in the subnet being bridged
  • During installation, you should be online to facilitate access to latest documentation and support information, should they be needed.
  • Be sure to confirm access to the customer virtual environment.Check logins and access permissions prior to deployment.
  • This guide assumes a bridge mode deployment, which means the network will be down for a brief time. Please plan accordingly.
  • Prior to deploying any EdgeConnect physical appliance, you must have a detailed understanding of the customer’s network as it relates to the wide area network (WAN), including a detailed diagram showing IP addressing and physical connections. If you are planning to deploy EdgeConnect virtual appliances, download the quick start guide for virtual appliances, which outlines the detailed steps for your deployment type.

  • The deployment in this document assumes you have a single MPLS router and a single Internet firewall at the site—each device is deployed in its own subnet. If your customer’s network does not match this criteria, please reach out to the Silver Peak Deployment Engineer for your region for additional deployment options and guidance.